Menu

Check out our latest decommissioning campaign

  

Decommissioning Campaign

Trident Australia have recently concluded a successful multi well, decommissioning campaign in the Minerva field for one of our valued clients. Utilising Trident integrated offshore services, comprising of IWOCS and field technicians, we have helped deliver the project with zero Lost Time Incidents, zero operational downtime, and an impeccable Supplier Quality rating.

As part of the field's end-of-life activities, the project involved the safe disconnection and recovery of client subsea equipment in support of subsea well abandonment operations. Delivered on time and without disruption, this campaign demonstrated Trident’s ability to meet complex offshore challenges with efficiency and precision.

A major success factor was the engineering and fabrication of a dedicated deployment frame, purpose-built in-house to streamline offshore handling, meet client preferred deployment methodology and ensure safe, secure equipment recovery under demanding field conditions.

Project Scope Highlights:

  • Design and fabrication of a custom deployment frame to suit rig and client needs.
  • System readiness testing and operational verification.
  • Controlled disconnection and retrieval of subsea equipment.
  • Offshore mobilisation and execution by Trident’s experienced engineering and field service teams.
  • Project delivered on time and in-line with the client offshore schedule.

Learn more about our decommissioning and abandonment capabilities here.